Home/Cost guides/Concrete Driveway/South Burlington, VT
South Burlington metro · Vermont

Concrete Driveway cost in South Burlington, VT

South Burlington homeowners typically pay $3,900 – $10,600 for concrete driveway. Local labor and materials price 12% above the national average.

South Burlington average

$6,950

Typical low

$3,900

Typical high

$10,600

Per square foot

$7 – $20

Sample ZIP

What drives South Burlington pricing

Local labor

Licensed trade labor in South Burlington runs about 112% of the national average, and the best crews book out fastest in spring and early summer.

Permits & code

Most South Burlington, VT projects that change structure, electrical, plumbing or mechanical systems need a permit from the local building department; cosmetic work usually does not.

Climate & conditions

Vermont weather drives material choices here, so ask contractors what they install most often in South Burlington and why.

Instant cost calculator

Adjust the inputs to see live pricing

600 square feet

Estimated project cost

$4,032 $7,800

Most homeowners pay around $5,916

Compare finish

Cost by material in South Burlington

Installed South Burlington pricing per square foot.

OptionInstalled cost
Broom-finished concrete$7 – $13
Integral colored concrete$9 – $16
Exposed aggregate$11 – $18
Stamped concrete$13 – $22
Concrete pavers$11 – $28
Asphalt (for comparison)$4 – $10

Where the money goes in South Burlington

A typical $6,950 South Burlington project, broken down by line item.

  • Concrete and reinforcement38% · $2,641
  • Labor34% · $2,363
  • Base prep and grading17% · $1,182
  • Demolition and disposal11% · $765

Common add-ons

Extras that show up on South Burlington quotes but rarely in the headline price.

Remove old concrete

Per square foot

$2 – $7

Rebar reinforcement upgrade

Per square foot

$1 – $2

Sealing

Per square foot

$1 – $2

Apron or curb cut

$560 – $2,800

Drainage channel

$670 – $2,800

Heated driveway coils

Per square foot

$13 – $28

Ways to save in South Burlington

  • Stay with a 4-inch broom finish and spend the savings on proper base prep.
  • Keep the driveway rectangular; curves and borders add forming labor.
  • Combine your pour with a neighbor to share the truck and crew mobilization.
  • Pour in spring or fall — summer schedules are booked and priced higher.
  • Resurface rather than replace if the slab is structurally sound.

South Burlington FAQs

Get a South Burlington price you can budget against

Answer a few questions about your project and we'll model a low, average and premium price for your VT ZIP code — then connect you with vetted local pros.

Get driveway quotes

More South Burlington research

More Vermont cities

Other project costs in South Burlington