Burlington metro · Vermont

EV Charger Installation cost in Burlington, VT

Burlington homeowners typically pay $910 – $2,850 for ev charger installation. Local labor and materials price 14% above the national average.

Burlington average

$1,900

Typical low

$910

Typical high

$2,850

Per install

$910 – $2,850

Sample ZIP

What drives Burlington pricing

Local labor

Licensed trade labor in Burlington runs about 114% of the national average, and the best crews book out fastest in spring and early summer.

Permits & code

Most Burlington, VT projects that change structure, electrical, plumbing or mechanical systems need a permit from the local building department; cosmetic work usually does not.

Climate & conditions

Vermont weather drives material choices here, so ask contractors what they install most often in Burlington and why.

Instant cost calculator

Adjust the inputs to see live pricing

1 install

Estimated project cost

$1,093 $1,520

Most homeowners pay around $1,306

Compare quality / material level

Cost by material in Burlington

Installed Burlington pricing per install.

OptionInstalled cost
NEMA 14-50 outlet$1,150 – $1,600
Hardwired Level 2 charger$1,600 – $2,100
Level 2 with panel upgrade$2,100 – $2,750
Dual charger with load management$2,750 – $3,750

Where the money goes in Burlington

A typical $1,900 Burlington project, broken down by line item.

  • Labor0.45% · $9
  • Materials0.38% · $7
  • Permits & inspections0.05% · $1
  • Overhead & profit0.12% · $2

Common add-ons

Extras that show up on Burlington quotes but rarely in the headline price.

Panel upgrade to 200A

$2,050 – $5,150

Long conduit run

$340 – $1,700

Load management device

$340 – $910

Permit and inspection

$85 – $455

Ways to save in Burlington

  • Check for federal, state and utility EV charger rebates before you buy.
  • Mount the charger as close to the panel as possible.
  • Collect three written bids on an identical scope — spreads of 20–40% are normal.
  • Book in the off-season and stay flexible on the start date to save 5–15%.
  • Bundle nearby work into one mobilization so you only pay setup and travel once.
  • Ask what the contractor would change to cut 10% without hurting durability.

Burlington FAQs

Get a Burlington price you can budget against

Answer a few questions about your project and we'll model a low, average and premium price for your VT ZIP code — then connect you with vetted local pros.

Get free quotes from certified pros

More Burlington research

More Vermont cities

Other project costs in Burlington