Home/Cost guides/Excavation and Grading
Construction

How much does excavation and grading cost?

Excavation and Grading costs $7,500 to $22,500 for a typical project, averaging about $15,000. Installed pricing usually runs $50.00 to $150.00 per cubic yard, and scope, materials, access and local labor rates explain nearly all of the variation.

National average

$15,000

Typical low

$7,500

Typical high

$22,500

Per cubic yard

$50 – $150

Instant cost calculator

Adjust the inputs to see live pricing

150 cubic yards

Estimated project cost

$10,160 $13,929

Most homeowners pay around $12,045

Compare quality / material level

Cost by material

Installed pricing per cubic yard.

OptionInstalled cost
Simple grading$62 – $85
Standard excavation and haul$85 – $112
Rock or difficult soil$112 – $145
Excavation with retaining and drainage$145 – $200

Excavation and Grading cost by project size

Typical installed pricing before local adjustments.

Project sizeBudgetAveragePremium
75 cubic yards$3,750$7,500$11,250
150 cubic yards$7,500$15,000$22,500
225 cubic yards$11,250$22,500$33,750
300 cubic yards$15,000$30,000$45,000

Excavation and Grading cost by material or quality level

OptionPrice rangeBest for
Simple grading$62.00 – $85.00 / cubic yardLowest upfront cost, shortest lifespan
Standard excavation and haul$85.00 – $112.00 / cubic yardBest overall value for most homes
Rock or difficult soil$112.00 – $145.00 / cubic yardLonger warranty and better finish
Excavation with retaining and drainage$145.00 – $200.00 / cubic yardTop-tier materials and custom detailing

Where the money goes

A typical project budget, broken down by line item.

  • Labor0.45% · $68
  • Materials0.38% · $57
  • Permits & inspections0.05% · $8
  • Overhead & profit0.12% · $18

Cost by region

Labor markets move the number more than any other single factor.

Northeast

$8,625 – $25,875

+15% vs. national average

West

$8,850 – $26,550

+18% vs. national average

Midwest

$7,200 – $21,600

-4% vs. national average

South

$7,050 – $21,150

-6% vs. national average

Common add-ons

Line items that show up on most quotes but rarely in the headline price.

Soil haul-off

$20 – $60

Rock breaking

$100 – $300

Erosion control

$500 – $3,000

Compaction testing

$400 – $1,500

DIY vs. hiring a pro

Hire a pro

$7,500 – $22,500

Do it yourself

$3,375 – $12,375

DIY saves labor but not materials, permits or rework. Only take it on if the job does not require a licensed trade or inspection.

Ways to save

Practical levers that lower the bill without cutting quality.

  • Keep excavated soil on site for backfill and berms to avoid haul-off.
  • Schedule when the ground is dry — wet soil doubles handling time.
  • Collect three written bids on an identical scope — spreads of 20–40% are normal.
  • Book in the off-season and stay flexible on the start date to save 5–15%.
  • Bundle nearby work into one mobilization so you only pay setup and travel once.
  • Ask what the contractor would change to cut 10% without hurting durability.

Questions to ask your contractor

  1. 01Are you licensed and insured in my city, and can I see the certificate?
  2. 02Is this a fixed-price bid or an estimate that can change?
  3. 03What exactly is excluded from the quote?
  4. 04Who pulls the permit and who schedules inspections?
  5. 05What is the written workmanship warranty and how long does it last?
  6. 06What is the payment schedule, and how much is due up front?
  7. 07How long will the work take, and what could delay it?

Frequently asked questions

Ready for a number you can budget against?

Answer a few questions about your project and we'll model a low, average and premium price for your ZIP code — then connect you with vetted pros.

Get free quotes from certified pros

Excavation and Grading cost by city

Local labor rates, permits and climate change the number. Pick your city for prices near you.