Home/Cost guides/Mold Remediation/College Station, TX
College Station metro · Texas

Mold Remediation cost in College Station, TX

College Station homeowners typically pay $1,400 – $3,550 for mold remediation. Local labor and materials price 2% below the national average.

College Station average

$2,450

Typical low

$1,400

Typical high

$3,550

Per square foot

$12 – $29

Sample ZIP

What drives College Station pricing

Local labor

Licensed trade labor in College Station runs about 98% of the national average, and the best crews book out fastest in spring and early summer.

Permits & code

Most College Station, TX projects that change structure, electrical, plumbing or mechanical systems need a permit from the local building department; cosmetic work usually does not.

Climate & conditions

Texas weather drives material choices here, so ask contractors what they install most often in College Station and why.

Instant cost calculator

Adjust the inputs to see live pricing

120 square feet

Estimated project cost

$1,482 $1,938

Most homeowners pay around $1,710

Compare quality / material level

Cost by material in College Station

Installed College Station pricing per square foot.

OptionInstalled cost
Surface cleaning$13 – $17
Contained remediation$17 – $23
Remediation with material removal$23 – $30
Whole-home remediation with HVAC cleaning$30 – $41

Where the money goes in College Station

A typical $2,450 College Station project, broken down by line item.

  • Labor0.45% · $11
  • Materials0.38% · $9
  • Permits & inspections0.05% · $1
  • Overhead & profit0.12% · $3

Common add-ons

Extras that show up on College Station quotes but rarely in the headline price.

Third-party air testing

$295 – $880

HVAC duct cleaning

$440 – $1,450

Drywall and insulation replacement

$490 – $3,900

Dehumidification equipment

$195 – $880

Ways to save in College Station

  • Fix the water source first — remediation without it fails within months.
  • Ask your insurer whether sudden water damage coverage applies.
  • Collect three written bids on an identical scope — spreads of 20–40% are normal.
  • Book in the off-season and stay flexible on the start date to save 5–15%.
  • Bundle nearby work into one mobilization so you only pay setup and travel once.
  • Ask what the contractor would change to cut 10% without hurting durability.

College Station FAQs

Get a College Station price you can budget against

Answer a few questions about your project and we'll model a low, average and premium price for your TX ZIP code — then connect you with vetted local pros.

Get free quotes from certified pros

More College Station research

More Texas cities

Other project costs in College Station