PriceBee
South Burlington metro · Vermont

Retaining Wall Installation cost in South Burlington, VT

South Burlington homeowners typically pay $4,200 – $10,100 for retaining wall installation. Local labor and materials price 12% above the national average.

South Burlington average

$7,150

Typical low

$4,200

Typical high

$10,100

Per square foot

$28 – $67

Sample ZIP

What drives South Burlington pricing

Local labor

Licensed trade labor in South Burlington runs about 112% of the national average, and the best crews book out fastest in spring and early summer.

Permits & code

Most South Burlington, VT projects that change structure, electrical, plumbing or mechanical systems need a permit from the local building department; cosmetic work usually does not.

Climate & conditions

Vermont weather drives material choices here, so ask contractors what they install most often in South Burlington and why.

Instant cost calculator

Adjust the inputs to see live pricing

150 square feet

Estimated project cost

$4,275 $5,700

Most homeowners pay around $4,988

Compare quality / material level

Cost by material in South Burlington

Installed South Burlington pricing per square foot.

OptionInstalled cost
Treated timber$30 – $40
Segmental concrete block$40 – $53
Poured concrete$53 – $69
Natural stone / boulder$69 – $95

Where the money goes in South Burlington

A typical $7,150 South Burlington project, broken down by line item.

  • Labor0.45% · $32
  • Materials0.38% · $27
  • Permits & inspections0.05% · $4
  • Overhead & profit0.12% · $9

Common add-ons

Extras that show up on South Burlington quotes but rarely in the headline price.

Drainage gravel and pipe

$560 – $2,800

Engineering for walls over 4 ft

$895 – $3,350

Steps and caps

$450 – $2,250

Excavation and haul-off

$670 – $3,900

Ways to save in South Burlington

  • Keep walls under four feet to avoid engineering and permit costs.
  • Terrace two short walls instead of one tall one.
  • Collect three written bids on an identical scope — spreads of 20–40% are normal.
  • Book in the off-season and stay flexible on the start date to save 5–15%.
  • Bundle nearby work into one mobilization so you only pay setup and travel once.
  • Ask what the contractor would change to cut 10% without hurting durability.

South Burlington FAQs

Get a South Burlington price you can budget against

Answer a few questions about your project and we'll model a low, average and premium price for your VT ZIP code — then connect you with vetted local pros.

Get free quotes from certified pros

More South Burlington research

More Vermont cities

Other project costs in South Burlington