Excavation and Grading cost in Camarillo, CA
Camarillo homeowners typically pay $8,850 – $26,600 for excavation and grading. Local labor and materials price 18% above the national average.
Camarillo average
$17,700
Typical low
$8,850
Typical high
$26,600
Per cubic yard
$59 – $175
Sample ZIP
93010
What drives Camarillo pricing
Local labor
Licensed Camarillo contractors carry California workers' comp and prevailing wage pressure, and crews here quote roughly 18% above the national labor average. Demand in the Ventura market peaks in spring, so booking early usually beats a rush premium.
Permits & code
Camarillo follows the California Building Standards Code, so most structural, electrical, plumbing and re-roof work needs a permit from the Camarillo building department plus Title 24 energy compliance. Ventura County adds wildfire hardening requirements in hillside and WUI areas.
Climate & conditions
Camarillo sits in a warm Mediterranean climate with intense summer sun, so expect UV-stable, heat-tolerant materials and shaded scheduling in peak summer.
Instant cost calculator
Adjust the inputs to see live pricing
Estimated project cost
$10,403 – $14,250
Most homeowners pay around $12,326
Compare quality / material level
Cost by material in Camarillo
Installed Camarillo pricing per cubic yard.
| Option | Installed cost |
|---|---|
| Simple grading | $73 – $100 |
| Standard excavation and haul | $100 – $130 |
| Rock or difficult soil | $130 – $170 |
| Excavation with retaining and drainage | $170 – $235 |
Where the money goes in Camarillo
A typical $17,700 Camarillo project, broken down by line item.
- Labor0.45% · $80
- Materials0.38% · $67
- Permits & inspections0.05% · $9
- Overhead & profit0.12% · $21
Common add-ons
Extras that show up on Camarillo quotes but rarely in the headline price.
Soil haul-off
Rock breaking
Erosion control
Compaction testing
Ways to save in Camarillo
- Keep excavated soil on site for backfill and berms to avoid haul-off.
- Schedule when the ground is dry — wet soil doubles handling time.
- Collect three written bids on an identical scope — spreads of 20–40% are normal.
- Book in the off-season and stay flexible on the start date to save 5–15%.
- Bundle nearby work into one mobilization so you only pay setup and travel once.
- Ask what the contractor would change to cut 10% without hurting durability.