PriceBee
Bay Area · California

Excavation and Grading cost in Daly City, CA

Daly City homeowners typically pay $10,200 – $30,600 for excavation and grading. Local labor and materials price 36% above the national average.

Daly City average

$20,400

Typical low

$10,200

Typical high

$30,600

Per cubic yard

$68 – $205

Sample ZIP

94014

What drives Daly City pricing

Local labor

Licensed Daly City contractors carry California workers' comp and prevailing wage pressure, and crews here quote roughly 36% above the national labor average. Demand in the Bay Area market peaks in spring, so booking early usually beats a rush premium.

Permits & code

Daly City follows the California Building Standards Code, so most structural, electrical, plumbing and re-roof work needs a permit from the Daly City building department plus Title 24 energy compliance. Bay Area seismic retrofit standards and strict energy upgrades are common conditions of approval.

Climate & conditions

Daly City sits in a mild marine climate with heavy winter rain, so expect proper drainage, moisture detailing and a dry-season schedule for exterior work.

Instant cost calculator

Adjust the inputs to see live pricing

150 cubic yards

Estimated project cost

$11,970 $16,388

Most homeowners pay around $14,179

Compare quality / material level

Cost by material in Daly City

Installed Daly City pricing per cubic yard.

OptionInstalled cost
Simple grading$84 – $115
Standard excavation and haul$115 – $150
Rock or difficult soil$150 – $195
Excavation with retaining and drainage$195 – $270

Where the money goes in Daly City

A typical $20,400 Daly City project, broken down by line item.

  • Labor0.45% · $92
  • Materials0.38% · $78
  • Permits & inspections0.05% · $10
  • Overhead & profit0.12% · $24

Common add-ons

Extras that show up on Daly City quotes but rarely in the headline price.

Soil haul-off

$27 – $82

Rock breaking

$135 – $410

Erosion control

$680 – $4,100

Compaction testing

$545 – $2,050

Ways to save in Daly City

  • Keep excavated soil on site for backfill and berms to avoid haul-off.
  • Schedule when the ground is dry — wet soil doubles handling time.
  • Collect three written bids on an identical scope — spreads of 20–40% are normal.
  • Book in the off-season and stay flexible on the start date to save 5–15%.
  • Bundle nearby work into one mobilization so you only pay setup and travel once.
  • Ask what the contractor would change to cut 10% without hurting durability.

Daly City FAQs

Get a Daly City price you can budget against

Answer a few questions about your project and we'll model a low, average and premium price for your CA ZIP code — then connect you with vetted local pros.

Get free quotes from certified pros

More Daly City research

Excavation and Grading cost near Daly City

More California cities

Other project costs in Daly City