Excavation and Grading cost in Fontana, CA

Fontana homeowners typically pay $7,800 – $23,400 for excavation and grading. Local labor and materials price 4% above the national average.

Fontana average

$15,600

Typical low

$7,800

Typical high

$23,400

Per cubic yard

$52 – $155

Sample ZIP

92335

What drives Fontana pricing

Local labor

Licensed Fontana contractors carry California workers' comp and prevailing wage pressure, and crews here quote roughly 4% above the national labor average. Demand in the Inland Empire market peaks in spring, so booking early usually beats a rush premium.

Permits & code

Fontana follows the California Building Standards Code, so most structural, electrical, plumbing and re-roof work needs a permit from the Fontana building department plus Title 24 energy compliance. Inland Empire jurisdictions add high-wind and fire-hardening requirements in foothill zones.

Climate & conditions

Fontana sits in a hot, dry inland climate with Santa Ana wind events, so expect wind-rated fasteners, fire-resistant materials and heat-tolerant finishes.

Instant cost calculator

Adjust the inputs to see live pricing

150 cubic yards

Estimated project cost

$9,120 $12,540

Most homeowners pay around $10,830

Compare quality / material level

Cost by material in Fontana

Installed Fontana pricing per cubic yard.

OptionInstalled cost
Simple grading$64 – $88
Standard excavation and haul$88 – $115
Rock or difficult soil$115 – $150
Excavation with retaining and drainage$150 – $210

Where the money goes in Fontana

A typical $15,600 Fontana project, broken down by line item.

  • Labor0.45% · $70
  • Materials0.38% · $59
  • Permits & inspections0.05% · $8
  • Overhead & profit0.12% · $19

Common add-ons

Extras that show up on Fontana quotes but rarely in the headline price.

Soil haul-off

$21 – $62

Rock breaking

$105 – $310

Erosion control

$520 – $3,100

Compaction testing

$415 – $1,550

Ways to save in Fontana

  • Keep excavated soil on site for backfill and berms to avoid haul-off.
  • Schedule when the ground is dry — wet soil doubles handling time.
  • Collect three written bids on an identical scope — spreads of 20–40% are normal.
  • Book in the off-season and stay flexible on the start date to save 5–15%.
  • Bundle nearby work into one mobilization so you only pay setup and travel once.
  • Ask what the contractor would change to cut 10% without hurting durability.

Fontana FAQs

Get a Fontana price you can budget against

Answer a few questions about your project and we'll model a low, average and premium price for your CA ZIP code — then connect you with vetted local pros.

Get free quotes from certified pros

More Fontana research

Excavation and Grading cost near Fontana

More California cities

Other project costs in Fontana