Excavation and Grading cost in Manteca, CA

Manteca homeowners typically pay $7,650 – $23,000 for excavation and grading. Local labor and materials price 2% above the national average.

Manteca average

$15,300

Typical low

$7,650

Typical high

$23,000

Per cubic yard

$51 – $155

Sample ZIP

95336

What drives Manteca pricing

Local labor

Licensed Manteca contractors carry California workers' comp and prevailing wage pressure, and crews here quote roughly 2% above the national labor average. Demand in the Central Valley market peaks in spring, so booking early usually beats a rush premium.

Permits & code

Manteca follows the California Building Standards Code, so most structural, electrical, plumbing and re-roof work needs a permit from the Manteca building department plus Title 24 energy compliance. Valley jurisdictions add farmland and air-quality district conditions on larger scopes.

Climate & conditions

Manteca sits in a hot inland valley climate with triple-digit summers, so expect material choices that tolerate heat and UV, and crews that start work early in the day during summer.

Instant cost calculator

Adjust the inputs to see live pricing

150 cubic yards

Estimated project cost

$8,978 $12,398

Most homeowners pay around $10,688

Compare quality / material level

Cost by material in Manteca

Installed Manteca pricing per cubic yard.

OptionInstalled cost
Simple grading$63 – $87
Standard excavation and haul$87 – $115
Rock or difficult soil$115 – $150
Excavation with retaining and drainage$150 – $205

Where the money goes in Manteca

A typical $15,300 Manteca project, broken down by line item.

  • Labor0.45% · $69
  • Materials0.38% · $58
  • Permits & inspections0.05% · $8
  • Overhead & profit0.12% · $18

Common add-ons

Extras that show up on Manteca quotes but rarely in the headline price.

Soil haul-off

$20 – $61

Rock breaking

$100 – $305

Erosion control

$510 – $3,050

Compaction testing

$410 – $1,550

Ways to save in Manteca

  • Keep excavated soil on site for backfill and berms to avoid haul-off.
  • Schedule when the ground is dry — wet soil doubles handling time.
  • Collect three written bids on an identical scope — spreads of 20–40% are normal.
  • Book in the off-season and stay flexible on the start date to save 5–15%.
  • Bundle nearby work into one mobilization so you only pay setup and travel once.
  • Ask what the contractor would change to cut 10% without hurting durability.

Manteca FAQs

Get a Manteca price you can budget against

Answer a few questions about your project and we'll model a low, average and premium price for your CA ZIP code — then connect you with vetted local pros.

Get free quotes from certified pros