Excavation and Grading cost in Milwaukee, WI

Milwaukee homeowners typically pay $7,650 – $23,000 for excavation and grading. Local labor and materials price 2% above the national average.

Milwaukee average

$15,300

Typical low

$7,650

Typical high

$23,000

Per cubic yard

$51 – $155

Sample ZIP

What drives Milwaukee pricing

Local labor

Licensed trade labor in Milwaukee runs about 102% of the national average, and the best crews book out fastest in spring and early summer.

Permits & code

Most Milwaukee, WI projects that change structure, electrical, plumbing or mechanical systems need a permit from the local building department; cosmetic work usually does not.

Climate & conditions

Wisconsin weather drives material choices here, so ask contractors what they install most often in Milwaukee and why.

Instant cost calculator

Adjust the inputs to see live pricing

150 cubic yards

Estimated project cost

$8,978 $12,398

Most homeowners pay around $10,688

Compare quality / material level

Cost by material in Milwaukee

Installed Milwaukee pricing per cubic yard.

OptionInstalled cost
Simple grading$63 – $87
Standard excavation and haul$87 – $115
Rock or difficult soil$115 – $150
Excavation with retaining and drainage$150 – $205

Where the money goes in Milwaukee

A typical $15,300 Milwaukee project, broken down by line item.

  • Labor0.45% · $69
  • Materials0.38% · $58
  • Permits & inspections0.05% · $8
  • Overhead & profit0.12% · $18

Common add-ons

Extras that show up on Milwaukee quotes but rarely in the headline price.

Soil haul-off

$20 – $61

Rock breaking

$100 – $305

Erosion control

$510 – $3,050

Compaction testing

$410 – $1,550

Ways to save in Milwaukee

  • Keep excavated soil on site for backfill and berms to avoid haul-off.
  • Schedule when the ground is dry — wet soil doubles handling time.
  • Collect three written bids on an identical scope — spreads of 20–40% are normal.
  • Book in the off-season and stay flexible on the start date to save 5–15%.
  • Bundle nearby work into one mobilization so you only pay setup and travel once.
  • Ask what the contractor would change to cut 10% without hurting durability.

Milwaukee FAQs

Get a Milwaukee price you can budget against

Answer a few questions about your project and we'll model a low, average and premium price for your WI ZIP code — then connect you with vetted local pros.

Get free quotes from certified pros

More Milwaukee research

More Wisconsin cities

Other project costs in Milwaukee