Excavation and Grading cost in Monterey Park, CA
Monterey Park homeowners typically pay $8,950 – $26,800 for excavation and grading. Local labor and materials price 19% above the national average.
Monterey Park average
$17,900
Typical low
$8,950
Typical high
$26,800
Per cubic yard
$60 – $180
Sample ZIP
91754
What drives Monterey Park pricing
Local labor
Licensed Monterey Park contractors carry California workers' comp and prevailing wage pressure, and crews here quote roughly 19% above the national labor average. Demand in the Los Angeles market peaks in spring, so booking early usually beats a rush premium.
Permits & code
Monterey Park follows the California Building Standards Code, so most structural, electrical, plumbing and re-roof work needs a permit from the Monterey Park building department plus Title 24 energy compliance. Seismic bracing and soft-story retrofit rules apply to many older LA-area properties, and hillside lots trigger extra geotechnical review.
Climate & conditions
Monterey Park sits in a warm Mediterranean climate with intense summer sun, so expect UV-stable, heat-tolerant materials and shaded scheduling in peak summer.
Instant cost calculator
Adjust the inputs to see live pricing
Estimated project cost
$10,545 – $14,250
Most homeowners pay around $12,398
Compare quality / material level
Cost by material in Monterey Park
Installed Monterey Park pricing per cubic yard.
| Option | Installed cost |
|---|---|
| Simple grading | $74 – $100 |
| Standard excavation and haul | $100 – $135 |
| Rock or difficult soil | $135 – $175 |
| Excavation with retaining and drainage | $175 – $240 |
Where the money goes in Monterey Park
A typical $17,900 Monterey Park project, broken down by line item.
- Labor0.45% · $81
- Materials0.38% · $68
- Permits & inspections0.05% · $9
- Overhead & profit0.12% · $21
Common add-ons
Extras that show up on Monterey Park quotes but rarely in the headline price.
Soil haul-off
Rock breaking
Erosion control
Compaction testing
Ways to save in Monterey Park
- Keep excavated soil on site for backfill and berms to avoid haul-off.
- Schedule when the ground is dry — wet soil doubles handling time.
- Collect three written bids on an identical scope — spreads of 20–40% are normal.
- Book in the off-season and stay flexible on the start date to save 5–15%.
- Bundle nearby work into one mobilization so you only pay setup and travel once.
- Ask what the contractor would change to cut 10% without hurting durability.
Monterey Park FAQs
Get a Monterey Park price you can budget against
Answer a few questions about your project and we'll model a low, average and premium price for your CA ZIP code — then connect you with vetted local pros.
Get free quotes from certified prosMore Monterey Park research
Excavation and Grading cost near Monterey Park
Excavation and Grading cost in Los Angeles, CA
$9,326 – $27,926
Excavation and Grading cost in Long Beach, CA
$9,176 – $27,476
Excavation and Grading cost in Pasadena, CA
$9,627 – $28,827
Excavation and Grading cost in Glendale, CA
$9,401 – $28,151
Excavation and Grading cost in Santa Clarita, CA
$8,724 – $26,124
Excavation and Grading cost in Torrance, CA
$9,251 – $27,701