Home/Cost guides/Excavation and Grading/Palm Beach Gardens, FL
Palm Beach Gardens metro · Florida

Excavation and Grading cost in Palm Beach Gardens, FL

Palm Beach Gardens homeowners typically pay $8,650 – $25,900 for excavation and grading. Local labor and materials price 15% above the national average.

Palm Beach Gardens average

$17,300

Typical low

$8,650

Typical high

$25,900

Per cubic yard

$57 – $175

Sample ZIP

What drives Palm Beach Gardens pricing

Local labor

Licensed trade labor in Palm Beach Gardens runs about 115% of the national average, and the best crews book out fastest in spring and early summer.

Permits & code

Most Palm Beach Gardens, FL projects that change structure, electrical, plumbing or mechanical systems need a permit from the local building department; cosmetic work usually does not.

Climate & conditions

Florida weather drives material choices here, so ask contractors what they install most often in Palm Beach Gardens and why.

Instant cost calculator

Adjust the inputs to see live pricing

150 cubic yards

Estimated project cost

$10,118 $13,965

Most homeowners pay around $12,041

Compare quality / material level

Cost by material in Palm Beach Gardens

Installed Palm Beach Gardens pricing per cubic yard.

OptionInstalled cost
Simple grading$71 – $98
Standard excavation and haul$98 – $130
Rock or difficult soil$130 – $165
Excavation with retaining and drainage$165 – $230

Where the money goes in Palm Beach Gardens

A typical $17,300 Palm Beach Gardens project, broken down by line item.

  • Labor0.45% · $78
  • Materials0.38% · $66
  • Permits & inspections0.05% · $9
  • Overhead & profit0.12% · $21

Common add-ons

Extras that show up on Palm Beach Gardens quotes but rarely in the headline price.

Soil haul-off

$23 – $69

Rock breaking

$115 – $345

Erosion control

$575 – $3,450

Compaction testing

$460 – $1,700

Ways to save in Palm Beach Gardens

  • Keep excavated soil on site for backfill and berms to avoid haul-off.
  • Schedule when the ground is dry — wet soil doubles handling time.
  • Collect three written bids on an identical scope — spreads of 20–40% are normal.
  • Book in the off-season and stay flexible on the start date to save 5–15%.
  • Bundle nearby work into one mobilization so you only pay setup and travel once.
  • Ask what the contractor would change to cut 10% without hurting durability.

Palm Beach Gardens FAQs

Get a Palm Beach Gardens price you can budget against

Answer a few questions about your project and we'll model a low, average and premium price for your FL ZIP code — then connect you with vetted local pros.

Get free quotes from certified pros

More Palm Beach Gardens research

More Florida cities

Other project costs in Palm Beach Gardens