PriceBee
Bay Area · California

Cabinet Refacing cost in Alameda, CA

Alameda homeowners typically pay $3,300 – $11,500 for cabinet refacing. Local labor and materials price 31% above the national average.

Alameda average

$7,400

Typical low

$3,300

Typical high

$11,500

Per linear foot

$130 – $460

Sample ZIP

94501

What drives Alameda pricing

Local labor

Licensed Alameda contractors carry California workers' comp and prevailing wage pressure, and crews here quote roughly 31% above the national labor average. Demand in the Bay Area market peaks in spring, so booking early usually beats a rush premium.

Permits & code

Alameda follows the California Building Standards Code, so most structural, electrical, plumbing and re-roof work needs a permit from the Alameda building department plus Title 24 energy compliance. Bay Area seismic retrofit standards and strict energy upgrades are common conditions of approval.

Climate & conditions

Alameda sits in a mild marine climate with heavy winter rain, so expect proper drainage, moisture detailing and a dry-season schedule for exterior work.

Instant cost calculator

Adjust the inputs to see live pricing

25 linear feet

Estimated project cost

$4,394 $5,938

Most homeowners pay around $5,166

Compare quality / material level

Cost by material in Alameda

Installed Alameda pricing per linear foot.

OptionInstalled cost
Rigid thermofoil$185 – $250
Wood veneer$250 – $330
Solid wood doors$330 – $425
Custom paint-grade solid wood$425 – $590

Where the money goes in Alameda

A typical $7,400 Alameda project, broken down by line item.

  • Labor0.45% · $33
  • Materials0.38% · $28
  • Permits & inspections0.05% · $4
  • Overhead & profit0.12% · $9

Common add-ons

Extras that show up on Alameda quotes but rarely in the headline price.

New hardware

$130 – $785

Soft-close hinges and slides

$260 – $1,200

Pull-out shelving

$195 – $655

Crown molding

$395 – $1,550

Ways to save in Alameda

  • Reface only the uppers and paint the lowers for a two-tone look.
  • Reuse existing hardware if the hole spacing matches.
  • Collect three written bids on an identical scope — spreads of 20–40% are normal.
  • Book in the off-season and stay flexible on the start date to save 5–15%.
  • Bundle nearby work into one mobilization so you only pay setup and travel once.
  • Ask what the contractor would change to cut 10% without hurting durability.

Alameda FAQs

Get a Alameda price you can budget against

Answer a few questions about your project and we'll model a low, average and premium price for your CA ZIP code — then connect you with vetted local pros.

Get free quotes from certified pros

More Alameda research

Cabinet Refacing cost near Alameda

More California cities

Other project costs in Alameda