Baltimore metro · Maryland

Excavation and Grading cost in Baltimore, MD

Baltimore homeowners typically pay $8,550 – $25,600 for excavation and grading. Local labor and materials price 14% above the national average.

Baltimore average

$17,100

Typical low

$8,550

Typical high

$25,600

Per cubic yard

$57 – $170

Sample ZIP

What drives Baltimore pricing

Local labor

Licensed trade labor in Baltimore runs about 114% of the national average, and the best crews book out fastest in spring and early summer.

Permits & code

Most Baltimore, MD projects that change structure, electrical, plumbing or mechanical systems need a permit from the local building department; cosmetic work usually does not.

Climate & conditions

Maryland weather drives material choices here, so ask contractors what they install most often in Baltimore and why.

Instant cost calculator

Adjust the inputs to see live pricing

150 cubic yards

Estimated project cost

$10,118 $13,823

Most homeowners pay around $11,970

Compare quality / material level

Cost by material in Baltimore

Installed Baltimore pricing per cubic yard.

OptionInstalled cost
Simple grading$71 – $97
Standard excavation and haul$97 – $130
Rock or difficult soil$130 – $165
Excavation with retaining and drainage$165 – $230

Where the money goes in Baltimore

A typical $17,100 Baltimore project, broken down by line item.

  • Labor0.45% · $77
  • Materials0.38% · $65
  • Permits & inspections0.05% · $9
  • Overhead & profit0.12% · $21

Common add-ons

Extras that show up on Baltimore quotes but rarely in the headline price.

Soil haul-off

$23 – $68

Rock breaking

$115 – $340

Erosion control

$570 – $3,400

Compaction testing

$455 – $1,700

Ways to save in Baltimore

  • Keep excavated soil on site for backfill and berms to avoid haul-off.
  • Schedule when the ground is dry — wet soil doubles handling time.
  • Collect three written bids on an identical scope — spreads of 20–40% are normal.
  • Book in the off-season and stay flexible on the start date to save 5–15%.
  • Bundle nearby work into one mobilization so you only pay setup and travel once.
  • Ask what the contractor would change to cut 10% without hurting durability.

Baltimore FAQs

Get a Baltimore price you can budget against

Answer a few questions about your project and we'll model a low, average and premium price for your MD ZIP code — then connect you with vetted local pros.

Get free quotes from certified pros

More Baltimore research

More Maryland cities

Other project costs in Baltimore