Silver Spring metro · Maryland

Excavation and Grading cost in Silver Spring, MD

Silver Spring homeowners typically pay $9,150 – $27,500 for excavation and grading. Local labor and materials price 22% above the national average.

Silver Spring average

$18,300

Typical low

$9,150

Typical high

$27,500

Per cubic yard

$61 – $185

Sample ZIP

What drives Silver Spring pricing

Local labor

Licensed trade labor in Silver Spring runs about 122% of the national average, and the best crews book out fastest in spring and early summer.

Permits & code

Most Silver Spring, MD projects that change structure, electrical, plumbing or mechanical systems need a permit from the local building department; cosmetic work usually does not.

Climate & conditions

Maryland weather drives material choices here, so ask contractors what they install most often in Silver Spring and why.

Instant cost calculator

Adjust the inputs to see live pricing

150 cubic yards

Estimated project cost

$10,830 $14,963

Most homeowners pay around $12,896

Compare quality / material level

Cost by material in Silver Spring

Installed Silver Spring pricing per cubic yard.

OptionInstalled cost
Simple grading$76 – $105
Standard excavation and haul$105 – $135
Rock or difficult soil$135 – $175
Excavation with retaining and drainage$175 – $245

Where the money goes in Silver Spring

A typical $18,300 Silver Spring project, broken down by line item.

  • Labor0.45% · $82
  • Materials0.38% · $70
  • Permits & inspections0.05% · $9
  • Overhead & profit0.12% · $22

Common add-ons

Extras that show up on Silver Spring quotes but rarely in the headline price.

Soil haul-off

$24 – $73

Rock breaking

$120 – $365

Erosion control

$610 – $3,650

Compaction testing

$490 – $1,850

Ways to save in Silver Spring

  • Keep excavated soil on site for backfill and berms to avoid haul-off.
  • Schedule when the ground is dry — wet soil doubles handling time.
  • Collect three written bids on an identical scope — spreads of 20–40% are normal.
  • Book in the off-season and stay flexible on the start date to save 5–15%.
  • Bundle nearby work into one mobilization so you only pay setup and travel once.
  • Ask what the contractor would change to cut 10% without hurting durability.

Silver Spring FAQs

Get a Silver Spring price you can budget against

Answer a few questions about your project and we'll model a low, average and premium price for your MD ZIP code — then connect you with vetted local pros.

Get free quotes from certified pros

More Silver Spring research

More Maryland cities

Other project costs in Silver Spring