Madison excavation and grading pricing per cubic yard
Excavation and Grading cost per cubic yard in Madison, Wisconsin in 2026.
Low
$7,800
Average
$15,600
High
$23,400
Madison crews quote about $52 – $155 per cubic yard.
Multiply local unit rates by your real measurements.
What drives excavation and grading prices in Madison
Local labor, permitting and climate move Madison prices away from the national average.
Labor market
Licensed trade labor in Madison runs about 104% of the national average, and the best crews book out fastest in spring and early summer.
Permits
Most Madison, WI projects that change structure, electrical, plumbing or mechanical systems need a permit from the local building department; cosmetic work usually does not.
Climate
Wisconsin weather drives material choices here, so ask contractors what they install most often in Madison and why.
Madison unit pricing by material
Ways to lower your Madison price
- Keep excavated soil on site for backfill and berms to avoid haul-off.
- Schedule when the ground is dry — wet soil doubles handling time.
- Collect three written bids on an identical scope — spreads of 20–40% are normal.
- Book in the off-season and stay flexible on the start date to save 5–15%.
- Bundle nearby work into one mobilization so you only pay setup and travel once.
- Ask what the contractor would change to cut 10% without hurting durability.
Madison questions
People also search: excavation and grading cost Madison · excavation and grading near me Madison · excavation and grading price per cubic yard Madison · excavation and grading permit cost Madison
Price my project in Madison
Answer a few questions and we'll model a low, average and premium price for your zip code — then match you with accredited local pros.
Price my project