PriceBee
Los Angeles · California

Excavation and Grading cost in Burbank, CA

Burbank homeowners typically pay $9,450 – $28,400 for excavation and grading. Local labor and materials price 26% above the national average.

Burbank average

$18,900

Typical low

$9,450

Typical high

$28,400

Per cubic yard

$63 – $190

Sample ZIP

91502

What drives Burbank pricing

Local labor

Licensed Burbank contractors carry California workers' comp and prevailing wage pressure, and crews here quote roughly 26% above the national labor average. Demand in the Los Angeles market peaks in spring, so booking early usually beats a rush premium.

Permits & code

Burbank follows the California Building Standards Code, so most structural, electrical, plumbing and re-roof work needs a permit from the Burbank building department plus Title 24 energy compliance. Seismic bracing and soft-story retrofit rules apply to many older LA-area properties, and hillside lots trigger extra geotechnical review.

Climate & conditions

Burbank sits in a warm Mediterranean climate with intense summer sun, so expect UV-stable, heat-tolerant materials and shaded scheduling in peak summer.

Instant cost calculator

Adjust the inputs to see live pricing

150 cubic yards

Estimated project cost

$11,115 $14,963

Most homeowners pay around $13,039

Compare quality / material level

Cost by material in Burbank

Installed Burbank pricing per cubic yard.

OptionInstalled cost
Simple grading$78 – $105
Standard excavation and haul$105 – $140
Rock or difficult soil$140 – $185
Excavation with retaining and drainage$185 – $250

Where the money goes in Burbank

A typical $18,900 Burbank project, broken down by line item.

  • Labor0.45% · $85
  • Materials0.38% · $72
  • Permits & inspections0.05% · $9
  • Overhead & profit0.12% · $23

Common add-ons

Extras that show up on Burbank quotes but rarely in the headline price.

Soil haul-off

$25 – $76

Rock breaking

$125 – $380

Erosion control

$630 – $3,800

Compaction testing

$505 – $1,900

Ways to save in Burbank

  • Keep excavated soil on site for backfill and berms to avoid haul-off.
  • Schedule when the ground is dry — wet soil doubles handling time.
  • Collect three written bids on an identical scope — spreads of 20–40% are normal.
  • Book in the off-season and stay flexible on the start date to save 5–15%.
  • Bundle nearby work into one mobilization so you only pay setup and travel once.
  • Ask what the contractor would change to cut 10% without hurting durability.

Burbank FAQs

Get a Burbank price you can budget against

Answer a few questions about your project and we'll model a low, average and premium price for your CA ZIP code — then connect you with vetted local pros.

Get free quotes from certified pros

More Burbank research

Excavation and Grading cost near Burbank

More California cities

Other project costs in Burbank